LHD & RHDElectricMAXUS eTerron 9 2026
eTerron 9 / Interstellar X EV
325 kW dual-motor electric pickup with air suspension, 430 km WLTP range and a 3.5-tonne braked towing rating.
- Range
- 430 km
- Battery
- 102.2 kWh
- Drive
- 4WD
Fleet buyers are not optimising for specification, they are optimising for uptime and tender compliance. That pushes every decision the same way: simpler suspension, common wear parts across the order, a spare-parts package in the same container, and documentation that survives a procurement audit.
| Order size | Pricing | Loading | Included |
|---|---|---|---|
| 1–4 units | List FOB | Container or Ro-Ro | Standard document set |
| 5–9 units | Tier 1 discount | Consolidated container | Document set + parts list |
| 10–19 units | Tier 2 discount | Consolidated Ro-Ro or container | + spare-parts package quoted at cost freight |
| 20+ units | Tier 3 discount, SKD quoted | Dedicated loading plan | + SKD option, tender documentation, technician training quote |
Tier discounts are negotiated per order and confirmed on the proforma invoice — we do not publish the percentages, because destination, Incoterm, steering and colour mix all move the number. Kunta handles every enquiry above five units directly.
Most of the catalogue. These are the work bodies and the electric models — the specifications that stay serviceable in a market without deep workshop capability, and that tender schedules are usually written around.
LHD & RHDElectriceTerron 9 / Interstellar X EV
325 kW dual-motor electric pickup with air suspension, 430 km WLTP range and a 3.5-tonne braked towing rating.
LHD & RHDElectricT90 EV / Interstellar EV Long Range
A one-tonne payload electric pickup: 88 kWh, 330 km WLTP combined and 471 km on the city cycle.
LHDDieselInterstellar L 2.5T Diesel
The high-output workhorse: 165 kW and 520 Nm, 3.5-tonne towing, and a rated payload the OEM puts 100% above class.
LHD & RHDDieselInterstellar L 2.0T Diesel
Long-bed 2.0T diesel with 230 mm of ground clearance, a 1.44 m³ flat load bay and a body-colour chassis frame.
LHD & RHDDiesel & PetrolT60 Petrol & Diesel
The volume export pickup: petrol or diesel, 2WD or 4WD, short or long bed — eight configurations on one platform.
LHD & RHDElectricEV90 / eDeliver 9 Electric Van
The flagship electric large van: 465 km CLTC, up to 12.4 m³, and 9 to 15 seats on rear air suspension.
LHD & RHDDieselV90 / Deliver 9 Diesel Van
The diesel counterpart to the EV90: ZF 8-speed, 420 Nm, rear air suspension and a 47 dB cabin.
LHD & RHDElectricEV80 PRO Electric Panel Van
1.5-tonne payload electric panel van: 77 kWh LFP, 11 m³, and charging down to −30 °C.
LHD & RHDDieselV80 PRO Diesel Van
Four wheelbases, four roof heights and over fifty seat layouts — the most configurable van in the range.
LHDDiesel Plug-in Hybrid (PHEV)Yuanjie DM-D Diesel Hybrid
The first diesel plug-in hybrid large van: 280 kW, 798 Nm and 1,100 km of combined range.
LHDRange-Extender Electric (EREV)Dana Super Range-Extender
Electric drive with no charging dependency: 312 km on battery, 1,260 km CLTC combined, 1.5-tonne payload.
LHDElectricDana M1 Nine-Seat Electric
A 540 km nine-seat electric people carrier that still clears a 2.2 m height barrier.
LHDElectricDana V1 Compact Electric
The small electric van: 520 mm load floor, 21-minute fast charge, and a 350 km CLTC range.
LHDElectricDana V1L Long-Wheelbase Electric
The Dana V1 stretched: 8.9 m³, four battery options and up to 540 km CLTC on the same 520 mm floor.
LHDElectricLingsheng V100 Wide-Body Electric
Newly announced wide-body electric van: 150 kW, 11 m³, 376 km CLTC and a 36% gradeability.
Whatever the schedule asks for, prepared against your specification document rather than sent as a generic brochure. In practice that means:
At roughly twenty units per order, and only where the tariff on an incomplete knocked-down kit is materially below the tariff on a complete built-up vehicle. Below that volume the fixed cost of an assembly line outweighs the duty saving. Get a binding tariff ruling from your customs authority against the specific kit definition before committing capital — a kit that is one step too complete is classified as a complete vehicle and the business case collapses. Full SKD arithmetic →
A parts buffer, a trained technician and — for the electric models — depot charging, in that order. Order the parts package with the first shipment: service items, high-wear components and the model-specific parts a general workshop will not stock ship in the same container at no additional freight cost, and having them on the shelf is the difference between a two-day and a six-week repair.
If the order includes eTerron 9 or T90 EV units, an 11 kW three-phase supply charges either fully overnight and most commercial premises already have it. Load-managed charge points cut the required site capacity by roughly half against unmanaged ones. Depot charging sizing guide →
Kunta handles wholesale, fleet and B2B cooperation directly — English, Mandarin, Russian (written).
WhatsApp Kunta — +86 166 4651 6666Attach the specification document and the delivery window. We return a compliance matrix and a priced proforma invoice, usually within two business days.